November 5, 2026
On Tuesday, Oct. 27, a bulldozer was parked outside a tent at the former South Weymouth Naval Air Station. Inside, Gov. Maura Healey, House Speaker Ron Mariano, Lt. Gov. Kim Driscoll and Mayor Mike Molisse were cutting a ribbon on Union Point, the redevelopment that has been on and off for decades. According to the Patriot Ledger's coverage of the "Reimagine The Base" kickoff, the state has put $35 million toward roads, utilities and related work, and new roadwork was about to begin before homes and commercial buildings go up.
The plan calls for 6,500 housing units and about 2 million square feet of commercial and retail space across a site of roughly 1,400 acres in Weymouth, Rockland and Abington. For anyone deciding whether to buy in Weymouth over the next year or two, the size of the plan matters less than its order of operations. The order is set by how much water Weymouth can provide, and on the developers' own schedule the first new homes won't have residents until spring 2028.
At a Weymouth Town Council meeting on May 4, 2026, Paul Cincotta and John Twohig of New England Development presented phase one as approximately 3,000 homes on nine parcels, built by five or six builders. The mix includes single-family homes, townhouses, apartments and condos. When a councilor asked about senior housing, Twohig said 165 active-adult rental homes are proposed, plus several hundred more active-adult homes in the Coast Guard area, for roughly 500 in total.
Now compare that with the resale market. In the Massachusetts Association of Realtors' September 2026 Weymouth report, Weymouth had 281 single-family closings and 116 condo closings from January through September 2026. That's 397 resales in nine months. Phase one alone, rentals included, is more than seven times that number.
If all of those homes arrived at once, they would change the market. They won't arrive at once, and the reason starts underground.
Weymouth has set aside 450,000 gallons per day of municipal water for the project. Under municipal law, that water can't be piped across town lines into Abington or Rockland. South Shore News reported in September that all current development is therefore on the Weymouth side of the base, and it quoted Twohig at an Abington Select Board hearing:
"We have over 2,500 homes pre-sold, and that's a combination of multifamily, single-family, townhomes, and over-55 developments... All in Weymouth, because that's the only place we have water."
The timeline Twohig presented to the Town Council in May puts builder land sales in early 2027 and targets initial occupancies for spring 2028. However many homes are spoken for, nobody moves into one before that second date.
Abington's 179-acre portion, planned for commercial office space, institutional uses and senior or over-55 townhomes, stays on hold until it has its own water. According to South Shore News, the developers have signed a preliminary memorandum of understanding to reserve 350,000 gallons per day from the City of Brockton and are looking at improvements to existing local wells so construction there can start sooner.
The long-term fix is a connection to the Massachusetts Water Resources Authority. The Town of Weymouth's July 7 announcement describes a 6.7-mile pipeline. The Final Environmental Impact Report is expected by the end of 2026, and completion is projected for 2031. The line would run from the Blue Hills, which Twohig told the council was the quickest route because most of the infrastructure needed is already there. Cincotta said the pipe can carry more than 13 million gallons a day. Weymouth needs 5.5 million, which leaves about 8 million for the region.
Weymouth hasn't been admitted to the MWRA yet. State House News Service reported on Sept. 25 that the town's application was still in state environmental review. Interbasin Transfer Act review, votes by the MWRA Advisory Board and Board of Directors, and local approvals still lie ahead.
The infrastructure start had already moved from August to late October. Spring 2028 sits at the end of the steps that come before it, so it moves if they move.
Until new homes come online, Weymouth buyers are competing in the existing resale market, and for single-family homes that market is tight. According to the MAR September 2026 report, Weymouth had 1.6 months of single-family supply in September 2026, down from 1.7 a year earlier. Year to date through September, the single-family median sale price was $685,000, up 4.2%. Sellers received 102.0% of their original list price on average, and new listings were down 5.8% from the same period in 2025. Union Point's first phase doesn't touch any of those numbers until people can move in.
The data does show one change. Cumulative days on market for single-family homes averaged 35 from January through September 2026, up from 28 in the same period of 2025. Homes took a bit longer to sell, but they still sold above their original asking price on average.
Condos are a different market:
| Weymouth, Jan.–Sept. 2026 | Single-family | Condo |
|---|---|---|
| Closed sales | 281 | 116 |
| Median sale price | $685,000 | $380,500 |
| Change vs. 2025 | +4.2% | −2.4% |
| % of original list received | 102.0% | 97.9% |
| Cumulative days on market | 35 | 38 |
For condos, the median price was lower than a year earlier, and sellers received less than their original list price on average. MAR's figures don't account for seller concessions. Single-family buyers in 2026 and 2027 face the tighter market of the two, and phase one won't add new competition until 2028 at the earliest.
The Southfield Redevelopment Authority's FY2024 annual report counted 1,271 residential units completed at the base as of June 30, 2024. One of those projects, Stonebridge Homes, has 45 single-family houses. At the SRA's March 4, 2026 meeting, the authority said all of them had been sold and were occupied.
For those households and the rest of South Weymouth, the next few years mean road and utility construction before any new homes go up. The town's July announcement says more than 880 acres, nearly two-thirds of the base, are set to be preserved as open and restricted space.
When could I move into a new phase-one home at Union Point? The developers' timeline has builders buying land in early 2027 and first occupancies in spring 2028. Any home you could move into at the base before then is one that's already built.
Will the new supply push Weymouth prices down? The size of phase one compared with annual resales means it could matter once homes are finished. The first ones aren't scheduled before spring 2028, and the remaining phases depend partly on MWRA water projected for 2031.
Why does Abington have to wait while Weymouth moves ahead? Weymouth's 450,000 gallons a day can't cross town lines, so Abington needs its own source. That could be the Brockton arrangement now in early negotiation, improvements to local wells, or the MWRA line.
What would change this timeline? Delays to the road and utility work, the builder land sales, or the MWRA approvals. Any of those would push back the steps that follow it.
If you're trying to decide whether to buy in Weymouth now or wait for Union Point, it helps to look at the specific streets and homes that fit your budget. Jamie Iacoi can go through recent South Weymouth sales with you and show you what's actually for sale today. Let's Connect.